Blackout and Plan B: Who decides when your region goes dark?

Heathrow closed despite three power feeds. Spain’s airports remained open while some access routes faltered. Who can act outside your region before the next deadline?

Editorial version 7 November 2026≈ 23 min read
An illuminated window in a dark building façade
HEATHROWThree power feeds, yet closed
SWITCHOVER10–12 hours in the plan
SPAIN93% of flights operated; access was disrupted
YOUR TESTFirst external action before the loss deadline

A second location matters when someone there can act in time.

01 / THE DIAGNOSIS

Authority, operations and family rarely move at the same time. A plan tied entirely to your own journey can fail at a single handover.

02 / THE PROOF

Name the person outside the region, their specific authority and the counterparty that must accept it. Rehearse the first lawful action without your primary devices.

03 / THE CONSEQUENCE

If the external action succeeds only after the loss deadline, that function does not yet have a reliable Plan B in the scenario tested.

In this analysis · Chapters

The short answer: In a widespread power outage, first protect the people on the ground, check reliable situation reports and maintain essential supplies.

Business owners and internationally mobile families face a second question: Which business or family function must continue before its deadline, and who can lawfully set it in motion outside the disrupted region? The test below turns that question into a decision you can verify.

For immediate household preparedness, consult the guidance of Germany’s Federal Office of Civil Protection and Disaster Assistance. Our focus here is the additional question of leadership and mobility.

On the evening of March 20, 2025, a substation near London caught fire. Heathrow had three independent power feeds. Only one failed. Yet systems essential to the airport lost power, and it remained largely closed the following day while its internal supply was switched and safety checks were carried out.

Switching to the other two feeds had been planned. Under the arrangements then in place, the internal transfer took ten to twelve hours. That interval was little known outside the technical team; the energy companies were unaware of it. [1]

You can read this as airport news. Or you can ask an uncomfortable question about everything you call “Plan B”.

There is a backup. There is a destination. The time required to make the transition is barely known outside the technical team. Those hours determine whether the plan performs a function or merely exists on an organizational chart.

The blackout across the Iberian Peninsula a month later revealed the opposite kind of gap. Spain’s airports remained open on emergency power, and 93 percent of commercial flights operated. Difficulties arose, among other things, on the way to the airport and through restrictions in the airspace. [2]

In one case, the airport itself was the bottleneck. In the other, the bottleneck lay on the journey there. For an internationally mobile family or business owner, the question is the same: Who can act when your home region cannot reliably respond?

Open your calendar. Find your next real deadline that another person or a business depends on: payroll, care for a relative, a binding company decision. Beside it, write the name of the person who could meet it if, on the morning it falls due, you had neither power nor mobile service. If only your own name comes to mind, read on.

This is not a theoretical blackout problem. It is a gap in your leadership that is visible today.

My diagnosis goes beyond asking whether you own a second home: An international Plan B often fails because authority, operations and family are expected to move together. They have different deadlines and require different routes.

At times your company can already be directed from elsewhere while your family remains safely where it is. At other times, the family needs care or relocation first while the business waits. Tie every decision to a single departure and you turn three decisions into one wager.

“A second place is not yet a second route. What matters is who can act from there before you can reach it yourself.”

— Alexander Erber
CHAPTER 01 / 06

Black Sky: What business owners and families need to know

A BBC report from November 2026 asks what happens in a severe “Black Sky” event. Here, the term describes a widespread and consequential power outage scenario. British official documents call the scenario a “national power outage”. The UK Chief Medical Officers describe it as very unlikely and set out possible consequences for telecommunications, water, sewage, fuel, gas and electronic payments. [3]

Such a scenario is useful because it exposes dependencies that become visible only when several ordinary services fail at once.

That happened in Lancaster in 2015. After flooding, more than 61,000 homes and businesses lost power and, subsequently, other everyday services; more than 100,000 people were affected. Professor Roger Kemp’s investigation also examined businesses, hospitals, care facilities and transport. [4]

Kemp said of the experience, as quoted by Lancaster University:

“What did come as a shock was the loss of so many systems at once and the effects this had on our lives.”

— Roger Kemp · Lancaster University [4]

It is easy to reduce a power outage to lights, heating and the refrigerator. A business owner must ask further: Who receives a situation report when the primary communications channel fails? Who makes a decision when their own region offers no reliable response? Where is someone outside that outage who can act both legally and technically?

A family asks different questions: Who collects relatives? Who has medication and documents? Must anyone travel at all, or is it safer to stay put for now? Their safety takes precedence over a payment instruction and over the comforting idea that one can always “pack a bag and leave”.

The first mistake in many Plan B conversations is to place every answer with the same person at the same moment. The founder is expected to assess the situation, authorize the bank, run the company, organize the family and reach the airport. In normal times, that may be called efficiency. In a regional outage, it becomes a chain whose first weak link delays every subsequent decision.

Our broader stress test of strategic sovereignty asks whether ownership, control and access still align under pressure. Here we apply a narrower test: Can a specifically named person outside the outage area actually perform the first necessary act before your loss deadline?

Another account, residence rights and a second company are valuable options. If each still depends on the same decision-maker or device, their value within the relevant window can fall to zero.

Write down an answer: Who is outside your principal region today and could make an important decision without first needing you, your phone or a service located in your region?

CHAPTER 02 / 06

Heathrow and Spain: Two blackout bottlenecks

The British system operator NESO’s report on the North Hyde fire is instructive precisely because it is not an abstract Black Sky fantasy. 66,919 directly supplied domestic and business customers were affected; road, rail and a hospital also felt the consequences. The investigation found that the fault most likely arose in a high-voltage component into which moisture had entered. Elevated moisture levels had appeared in samples as early as 2018.

According to NESO, action commensurate with the seriousness of that finding had not been taken. [1]

Two clocks were running here, though public discussion seldom puts them together. Years elapsed between an early signal and the later event. Hours elapsed between the event and a usable alternative supply.

The first clock concerns leadership: Who sees a signal, tests another explanation and decides in time whether to invest or prepare? The second is operational: How long does the alternative route take in an actual failure?

Anyone who plans ahead must take both seriously. A signal from 2018 does not prove that the precise fire in March 2025 could have been predicted. It does show that a documented finding called for a timely decision. The later investigation identifies both that earlier finding and the transfer process, whose duration was insufficiently understood beyond the technical team. [1]

When the Spanish blackout struck on Monday, April 28, 2025 at 12:33 p.m., Carlos González Constán found everyday life suddenly transformed. Power and some mobile connections failed. In a later personal account for the Bank of Spain’s blog, he describes ATMs that still held cash but would not work because they lacked backup power or network connectivity.

At first, he wrote, “we had no idea how long it would last”. Buying food or medicine, and even getting home, became harder in many places. [2]

At the same time, Spain’s airport network operators had decisions to make. Aena switched to emergency power, convened crisis committees at every airport, coordinated with airlines and air traffic control, and adjusted night flight schedules. 93 percent of commercial flights took place.

The operator nevertheless reported difficulties with public and private transport to the airports and restrictions in the airspace. [2] Decisions were made and infrastructure worked. Yet a traveler could still lack a dependable connection between home and terminal.

That is the No Borders Founder question for an international structure: What transition connects your present location to the first function that can operate outside the region? The question is not simply “Do you have Bank B?” It is who may use Bank B, under what mandate, when Bank A, your device and regional communications cannot help. It is not simply “Do you have a visa?” It is whether a person reachable there can already do what is needed even if you must stay where you are for now.

A passport establishes identity and nationality; travel, entry and residence are governed by the applicable rules. A residence permit is not yet practical access to the life you have planned. A banking relationship offers a possible payment route. A power of attorney offers possible authority. Only a rehearsed handover connects them into an answer.

That handover requires more than a signed document. An institution may require its own form, registration, identity check, signing rules, transaction limit or second approver. A representative may sit outside the region yet still depend on authentication from your phone or a document server in your city.

Ask the relevant counterparty not merely whether the person has authority, but which complete route it will accept for the critical action, and whether that route is available. A small test payment does not automatically establish that a larger or unusual transaction will be approved.

Write down an answer: Which of your fallback options begins to work only after you arrive in person? What must continue in the meantime?

Long, empty corridor at the Sofitel hotel at Gatwick Airport
CHAPTER 03 / 06

Three clocks: Authority, operations, family

When a region is disrupted, three movements are often mistaken for one. We separate them.

Movement What shifts First reliable evidence What stops the clock
Decision Authority and situation management pass to a person outside the affected region That person knows the trigger; the bank, company and relevant advisors accept their defined mandate A lawful decision has actually been made without referring back to the failed location
Operations A critical business or payment function moves to an independent route The specific instruction, recipient and approval process have been tested under realistic conditions The first required function works, such as an approved payment or a binding operational decision
People Family care, residence or travel is arranged Safety, supplies, documents, entry, accommodation and the actual travel corridor have been checked The family is safely provided for or reaches another suitable place

Return for a moment to the deadline in your calendar. The person whose name you wrote down is waiting for the action you promised. In the final hours, your external representative receives a message, but approval on your device does not arrive. Your family is safe for now; you do not yet know whether the road to the airport is passable.

If the representative has lawful authority to act, the promised action takes place on time while the family stays safe. If they have to wait for your arrival, the deadline passes. The person on your note does not receive what they relied on. That is the decision you need to test now.

These clocks need not run in that order. If relatives face immediate danger or lack essential care, their safety comes first. If they are safe where they are and only the company faces a deadline, an authorized person outside the region may act for the business sooner. Travel may make sense later, once the actual route is clear.

This is a practical distinction. An owner’s company may make a due decision from elsewhere without sending the family into uncertain transport conditions. For a wealthy family, a family office may prepare liquidity and accommodation while another named relative decides on care and travel.

Authority over assets is not automatically authority over people. Putting both into a single approval chain costs time and creates conflict.

For a lawyer, banker or tax advisor, this gives rise to a concrete task. Before an outage, ask what an external decision-maker may do and under which trigger. Will the counterparty accept the power of attorney and method of authentication? Could effective management from another location change a legal or tax assessment? Which decision expressly remains with the family?

Four questions professional advisors should answer before a crisis

Professional role The easily missed assumption Evidence to establish before a deadline
Legal counsel / corporate bodies An internal delegation will suffice for the bank and contracting parties. Valid appointment and authority under applicable law; acceptance by the relevant counterparty; a documented trigger and limit.
Bank / payments A second account is an independent payment route. Signatories, identification, limits, documents and approval methods have been established for the actual instruction; a permissible test is recorded.
Tax advisors External management has no tax consequences because it only bridges a disruption. The facts of management and residence, scope of functions, duration of presence and evidence obligations have been reviewed in the jurisdictions concerned.
Family office / family One person can manage assets and move every family member at the same time. Separate responsibilities for care, medical matters, parental and travel rights, accommodation and communication; a substitute has been named.

The table does not confer blanket legal powers on an “emergency representative”. It shows which confirmation is still needed from the competent party.

For a fuller treatment of the family as a separate decision-making unit, see our analysis of family governance and succession. A later, planned move with children calls for further scrutiny of custody, schools and care. An acute outage decision does not replace that longer-term planning.

A lawyer may have correctly drawn up and filed a power of attorney. If the bank nonetheless rejects it for the specific payroll instruction, the company misses its deadline. The client will reasonably ask who should have checked acceptance by the bank. The harm lies not only in a blocked payment but in a blurred boundary between a legally sound document and a mandate that can actually be executed.

The test is not whether everything has moved to another country within 72 hours. It is this: Which lawful function can begin outside the disruption before anyone travels, and what condition must be met before people do?

“If the whole family must arrive before anyone is allowed to run your company, you have tied mobility and leadership to the same bottleneck.”

— Alexander Erber

Write down two names: Who directs the business decision from outside? Who directs the family decision on the ground? If it is the same person, check whether they can in fact perform both tasks at once.

If those answers involve three countries, several institutions and different family members: That is what a Cross-Border Decision Blueprint is designed for. Bring the actual deadline, intended decision-makers, existing authorizations, bank access and proposed residence route.

We map conflicting prerequisites, formulate specific questions for the responsible legal, tax and banking specialists, and document which transitions can be initiated only after they confirm them. The outcome is a blueprint and implementation map. Specialist opinions and execution are commissioned separately.

CHAPTER 04 / 06

A change of location is not bank access

I wrote to a good friend that, based on my assessment of current signals, I would rather not be in the GCC region at present. A few days later I sent him news from Paraguay.

On November 2, 2026, the central bank had initiated a resolution procedure for Ueno Bank and subsequently announced guarantee payments for depositors. An unusually large number of new account openings temporarily strained some banking apps; the central bank said other access channels remained operational. [5]

My friend asked, in effect, whether my business model was now falling apart. My answer was no. His question treated two news items as a referendum on which country was “safe”. To me, they represent two different clocks.

My personal preference not to be in the GCC right now is a location decision made before a possible event. The resolution of a bank in Paraguay is a specific access issue that requires depositors to check the institutional process and the channels available to them.

The events do not establish a common crisis. Nor does news about a bank automatically mean a family should move. Attempting to shift everything at once can hold up the part of your plan that is already capable of working.

Liz Oakes of the Bank of England described a related danger for financial infrastructure: “a single event could simultaneously affect various different nodes of the financial system.” [6]

Our exercise raises the next question: Are you concentrating on reassuring the family when the company needs external leadership? Or are you rushing to travel while the family is safe where it is and only bank access needs attention? We examined the payment deadline itself in our analysis of a Black Swan event. Here, the decision turns on the right clock for the right action.

When banking news affects your plans, first establish which institution owes you what, which specific access is disrupted, and which already authorized route can meet your next deadline. Moving location answers none of those questions. Enter only the affected function in the outage test that follows; otherwise you risk mistaking a news report for an instruction to relocate everything.

Aerial view of a road intersection in Vilnius at night
CHAPTER 05 / 06

Blackout test: Who acts before the deadline?

Do you still have the deadline from your calendar in mind? Add the time after which the loss cannot be reversed, and name the person affected. For this exercise, assume power and mobile service in your principal region are temporarily unreliable. What matters is whether your alternative performs its first successful action before that deadline.

Your rights and assets have not all disappeared. What has disappeared is the comfortable assumption that you can personally direct every handover from that location.

01
Trigger

How does the person outside the region know it is time to act? Is there a reliable second source of information and a rule for when they stop waiting for your response?

02
Authority

What can this person actually decide without you? Which institution, board or contracting party has accepted the procedure? The family may require a different representation arrangement from the company.

03
First function

What one thing must work before your next deadline: an employee payment, medical care, accommodation, a commitment to a client, custody of a document? Who confirms execution when your own screen goes dark?

04
Travel gate

Are the people on the ground safe and provided for? Is a usable transport corridor available, along with a valid basis for entry and a place ready to receive them? If not, “go to the airport now” is an untested impulse, not a decision.

05
Stop and switch rule

What happens if the external decision-maker cannot be reached, the bank rejects the instruction, or travel proves impossible? Your answer must name another responsible person or the decision to remain safely where you are. “We will see then” is not a rule.

DECISION SHEET · ON THIS DEVICE ONLY

The first external action

Enter a real deadline and the route accepted by the counterparty. Your entries are neither saved nor sent to No Borders Founder.

TIMING CHECKEnter E and L

An earlier time alone proves neither authority nor acceptance by the counterparty.

Family separately: Name the person who decides on the ground, how long essential care is secured, the specific trigger for travel, and a confirmed entry and transport option. Record who takes over if that route fails.

A counter-test for the family office: The first person outside the region receives only an incomplete situation report. The company needs a decision before the market or bank closes, a relative requires care, and the principal cannot be reached. Signing rights may exist, but if nobody knows the agreed order, two legitimate actions compete for the same attention.

For each function, record a decision owner, an information channel, a last permissible time and a substitute. If objectives conflict, the responsible people and specialist advisors must settle their priority in advance. A crisis is the worst moment to negotiate it for the first time.

Assessment: A function “works” only if the first successful test takes place before the loss deadline and the person outside the region can lawfully perform the instruction without your primary devices. Without such a test, mark it “unverified”. After the deadline, without accepted authority or a fallback rule, mark the function “blocked”. If people face immediate danger, the family safety decision overrides the business sequence.

THE TIMING TEST

Can the external action happen before the loss?

EFirst confirmed external action

The earliest recorded time at which an authorized person outside your region acts successfully without your primary devices.

LLoss deadline

The point after which the missed function cannot be recovered without material harm.

E before L establishes only that this particular action was timely. Without evidence, or if E comes later, this route does not meet the deadline.

This is not a universal safety score. A small test instruction proves nothing about a larger one, and acceptance of a power of attorney by Bank A says nothing about Bank B. It does show, in writing, which specific promise already depends on an untested handover.

Read your own calendar entry again against the three clocks. If your external person can lawfully perform the critical function before your deadline, the family is safely provided for at home and the route to the airport is uncertain, the decision is to direct the function externally and defer travel. If the family’s care fails, that order changes.

If the external person lacks accepted authority or the test succeeds only after your deadline, the business route remains “blocked”, even if an account in another region is full of funds. Put the actual loss in the first column, rather than merely writing “risk”.

Speaking about bank resolution, Ruth Smith of the Bank of England advocates realistic exercises: “Realistic testing ultimately forces decision-makers to exercise the muscle of making decisions in uncertainty.” [7] Applying that thought to your family or company is our interpretation. The point is simple: An exercise ends only when the necessary step has been performed by the right person under realistic constraints. Filling in a field is the start; performing the action is the evidence.

Your result on one sheet of paper: Who takes over the critical function, from which location, and by what deadline? Which condition must be met before your family sets out? Record both on the decision sheet. If either answer is missing, you know what your Plan B must address today.

CHAPTER 06 / 06

Who coordinates, who executes?

In my work, I observe signals, weigh them against one another, ask what else might explain them, and develop options with clients long before a deadline becomes acute. Sometimes that lead time extends over years. Its value lies in the decision that can still be made calmly: arrange authority, test a banking route, establish a residence pathway, bring a family and its advisors into contact.

Heathrow offers a telling example. The investigation cites a finding from 2018 and a transfer time whose practical implications were not sufficiently known beyond a small technical circle. Nobody needed to know the exact hour of the later failure to take both the signal and the transition seriously. Foresight means more than recognizing a risk. It means changing the decision chain in time.

We turn early signals into prepared decisions concerning people, rights, access and places.

The decisive question: What must be arranged today for the next critical function to begin without you?

A serious mandate therefore ends with more than a list of residence rights, a second citizenship, banks and companies. It records the trigger for shifting a function, the accepted scope of external authority, the first proven operational route, responsibility for the family, the travel gate and the decision to make if a route is blocked.

Legal, tax, banking, migration and operational specialists assess their respective interfaces. No Borders Founder brings those answers into a sequence and makes contradictory assumptions visible.

A professional who refers a client to us should not have to relinquish their own remit. They should receive a precise brief for what needs checking.

The brief for professional advisors:

  • Which trigger transfers which action to whom?
  • Does the counterparty accept the authority where the action must take effect?
  • What legal and tax consequences could effective management or a longer stay in another country entail?

For a complex client, the coordinated answer is more valuable than five separate opinions, each correct within its own scope.

One bounded question: The Strategic Decision Review examines a specific decision point.

An interconnected situation: Family, company, banking access and several jurisdictions need one coherent sequence. No Borders Founder brings them together in the Cross-Border Decision Blueprint.

Implementation follows the reviewed decision, with clear responsibilities. [8]

Where Global Success Consulting enters: Once the cross-border decision has been made and a specific location, residence pathway or operating company needs to be prepared, Global Success Consulting can assess the practical Plan B/C arrangement. That assessment covers prerequisites, continuing costs and when the option must become usable.

It is a potential implementation or location assignment for Global Success Consulting. The wider architecture of authority and decisions described here remains a No Borders Founder matter. A location cannot approve a transaction on your behalf.

Frequently asked questions about blackout planning

What to do first in a blackout?

Germany’s Federal Office of Civil Protection and Disaster Assistance covers immediate household preparation. For a business or an internationally mobile family, a further question follows: Which function has a real deadline, and who can lawfully take it over outside the affected region?

How should a business prepare for a long power outage?

Berlin Chamber of Commerce and Industry recommends an emergency plan tailored to the circumstances. For cross-border functions, the bank, company or other responsible counterparty must also accept the specific authorization route.

Are a second account and a power of attorney enough?

Is a second passport or residence permit enough?

Can I run my company abroad during a blackout?

“I do not want to explain who has authority only after the lights go out. That decision belongs to the time when everything still works.”

— Alexander Erber

The next step does not begin with a suitcase. Take the completed line of your outage test and speak with the person who is meant to act outside your region. If that person cannot give you a clear answer today, your Plan B is not yet operational.

Assess mandate fit · Show us your next critical function, intended external decision-maker and untested handover. That gives us the basis for a focused review.


ANALYSIS TOOLS

Save, explore or export.

Editorial version 7 November 2026

MY READING LISTNo analysis saved yet

Your reading list stays in this browser; no data is sent to us.

View all insights
TOPIC WATCH

Save topics on this device. Article notifications are available through the bell on No Borders Founder.

Key terms in this analysis
Black Sky scenario
A widespread, consequential power outage that may also disrupt dependent services.
First external action (E)
A lawful action demonstrably completed by a named person outside the affected region.
Loss deadline (L)
The point after which a missed action cannot be recovered without material harm.
Accepting counterparty
The bank, company or other party that must actually accept the particular authority and approval route.
ARTICLE CONCIERGE

Where would you like to take this analysis?

STAY CONNECTED

More perspectives from Alexander Erber

New analyses and international developments, viewed through an entrepreneur’s lens.

FREE ARTICLE UPDATES

New analysis. Be first to know.

Choose German, US English or both for free browser notifications and confirm your subscription.

Choose article updatesFree. No email address. Turn off anytime.Add No Borders Founder as a preferred source on Google
Alexander Erber, Founder and Decision Architect at No Borders Founder
FOUNDER’S PERSPECTIVE

A second base works only if someone there can act before your deadline.

Your next commitment must follow your own calculation: who has authority, which institution will accept the action and when does your window close?

STRATEGIC PLAN B INITIAL BRIEFING

One hour to define the right brief.

Bring the critical function, the next deadline and your proposed decision route. In a personal conversation, Alexander Erber will identify the starting position, missing evidence and the order of the next reviews.

  1. 01
    Preparation

    Review the deadline, decision-maker, affected asset or business function and available evidence.

  2. 02
    60 minutes with Alexander Erber

    Assess the first real handover and its crucial dependencies together.

  3. 03
    Personal briefing memo

    Record outstanding questions, review scope and the appropriate next step.

CLEAR SCOPE

The initial briefing does not provide a structure design, final jurisdiction, legal, tax or feasibility review, or implementation recommendation. Any later engagement is accepted separately. Contracting service provider: No Borders Founder LLC; payment processing by Global Success Consulting FZE in Dubai.

THE NEXT STEP

Your Plan B starts before the next deadline.

When you can name the deadline, decision-maker and handover, the next review becomes clear.

The personal Plan B initial briefing offers a defined entry point at a total price of EUR 950 for private clients; business clients pay any legally applicable tax in addition.

01 / FUNCTION AND DEADLINE

Name the critical function and the point after which it cannot be recovered.

02 / AUTHORITY AND TEST

Test the first lawful external action with the party that must accept it.

03 / MANDATE AND DELIVERY

No Borders Founder structures the decision; specialist partners review the legal, tax and banking questions.